Village of Hamilton Wastewater Treatment Facility

Facing significant changes to their State Pollution Discharge Elimination System (SPDES) permit levels and more stringent effluent requirements due to the Chesapeake Bay Watershed TMDL, the Village of Hamilton selected MRB Group to evaluate the existing wastewater treatment plant and provide recommendations for improvements. Evaluations included the annual loading requirements for Nitrogen and Phosphorus to the receiving stream, based on current permitted flows as well as accommodating future flow scenarios.

MRB Group recommended a new design for the Hamiton WWTP that provides for the new limits and allows for the system’s capacity to serve Hamilton’s growing needs. The major improvements include:

  • Conversion of the existing aeration basins to SBR (Sequencing Batch Reactor) basins and the construction of two new SBR basins (4-Basin SBR system), including aerobic and anoxic phasing.
  • Retrofit of existing sand filters with tertiary disc filtration units.
  • New UV disinfection system.
  • Conversion of the existing final settling tanks to new aerobic digesters.
  • New belt filter press and sludge drying building.

With assistance from MRB Group, $3.1M in funding for the project was secured through NYS EFC with a 0% interest loan, and a grant in the amount of $1M was awarded through WQIP. MRB Group provided services from Design through construction phases including Bidding, Construction Administration, and Construction Observation.

Big Idea

Allow more capacity for future growth

CLIENT
Village of Hamilton
TEAM LEAD AND CLIENT MANAGER
Bill Davis
YEAR COMPLETED
2020
FUNDING
$3.1M NYS EFC, $1M WQIP
SERVICES
Design, Bidding, Construction Administration/Observation, Grant Services