O’Connell Electric Site Design
This Rochester-regional company wished to expand its footprint on its corporate property and turned to MRB Group for initial site development of the parcel and concept design for a 20,000 sf company building.
This project was a joint effort between MRB Group’s engineering and architecture studios to complete plans for a steel-framed structure to provide office space, a large training/conference area for 40-50 ppl, and all required support spaces.
The proposed site was located within the existing parking lot/storage area of the corporate campus. To accommodate additional parking needs, the stormwater management facility was converted to an underground stormwater detention facility. MRB Group provided documents for this design option for Town review and approvals.
Additional design calculations and contract drawings were provided for utilities (storm, sanitary and sewer), grading, erosion control, landscaping, parking areas, and site lighting photometrics. An engineering report for the design of the storm and sanitary pump station modifications, watermain hydraulic modeling, stormwater management facility, and erosion control measures was provided.
Architectural design included interior/exterior design options and scheduling, conceptual modeling, building permitting assistance, and construction administration.
Big Idea
Increase operating space
- CLIENT
- O'Connell Electric
- TEAM LEAD AND CLIENT MANAGER
- Justin HIldreth, AIA
- YEAR COMPLETED
- 2024
- SIZE
- 20,000 sf
- SERVICES
- Site Planning, Schematic Design, Architectural Design, Interior Design, Construction Administration