1 800-701-8746 info@mrbgroup.com

Pasada Pond Rehabilitation

Pasada Pond Rehabilitation

Project: Design, Bidding, Construction

Client: Round Rock, TX

Contact: Thomas Caponi, P.E.

Description: MRB Group was contracted by the Brushy Creek Municipal Utility District (BCMUD) to provide design, bidding, and construction phase services to rehabilitate the existing Posada Pond No: 2.

The District reported that the pond was no longer retaining water. Initial observations indicated that the pond needed significant maintenance. Water was likely seeping under and around the outlet structure, the pond’s forebay was full of sediment, and large trees had grown around the pond, potentially compromising the pond liner.

MRB prepared plans and specifications for a construction contractor to provide the needed maintenance. MRB also provided bidding assistance to the District, including support in evaluating contractor qualifications and construction phase services, including construction observation and administration.